Loucks pushes to start road work

SHARON — Road repair work is about to begin. On Monday, Sept. 13, at a special meeting, the Board of Selectmen approved Waters Construction of Bridgeport to do the project.

The company submitted a bid of $5,204,350, which is lower than the $6,280,000 approved by residents for the project at a special town meeting in late August.

First Selectman Bob Loucks said work is scheduled to begin around Sept. 27 — but it will start without a clerk of the works to oversee the finances and manage the progress of the project.

At the selectmen’s regular meeting at Town Hall on Tuesday, Sept. 14, the board took time to put together a help wanted advertisement for the position.

At the meeting, Loucks said the position would be temporary, but did not say for how long it would last.

“This will not be a position that the town will supply benefits for,†Loucks said.

Selectman Meg Szalewicz told Loucks she is not comfortable having the project get underway without a clerk of the works.

“No, I’m not really comfortable either,†Loucks agreed. “But I’m sure it will take a while to get everything up to speed [with the project], including moving equipment along and things like that.â€

While Loucks said he had ideas of which roads would be worked on first, he did not specify them at the meeting.

Previously, at the special town meeting held in August, Loucks said Calkinstown Road, West Cornwall Road and West Woods Road No. 2 would take top priority.

He said the town is looking to hire a clerk of the works by the beginning of October.

As for notifying residents where construction is taking place, Loucks said updates will be posted on the town’s website at sharonct.org.

The project will include upgrades and repairs to 40 miles of roads, including 31.5 miles of road that will be “reclaimed†and 7.8 miles of road that will have a new overlay.

Meanwhile, some other projects have already begun, on Calkinstown and lower King Hill.

Latest News

Wake Robin public hearing closes

Aradev LLC’s plans to redevelop Wake Robin Inn include four 2,000-square-foot cabins, an event space, a sit-down restaurant and fast-casual counter, a spa, library, lounge, gym and seasonal pool. If approved, guest room numbers would increase from 38 to 57.

Provided

LAKEVILLE — The public hearing for the redevelopment of Wake Robin Inn is over. Salisbury Planning and Zoning Commission now has two months to make a decision.

The hearing closed on Tuesday, Sept. 9, after its seventh session.

Keep ReadingShow less
Celebrating diverse abilities at Stanton Home fundraiser

The Weavery is Stanton Home’s oldest activity space, featuring a collection of vintage and modern floor looms. It offers opportunities for building dexterity, creative expression, and social connection through fiber arts.

Provided

Stanton Home is holding its annual Harvest Roast fundraiser on Saturday, Sept. 13 in Great Barrington, an evening of farm-to-table dining, live swing music, and community connection.

For nearly 40 years, Stanton Home has supported adults with intellectual and developmental disabilities through residential programs, therapeutic services and skill-building activities.

Keep ReadingShow less
Sharon Playhouse presents staged reading of ‘Die Mommie Die!’
Charles Busch wrote and stars in ‘Die Mommie Die!’ at Sharon Playhouse.
Provided

Following the memorable benefit reading last season of Charles Busch’s Tony-nominated Broadway hit, “The Tale of the Allergist’s Wife,” the Sharon Playhouse will present a one-night-only staged reading of his riotous comic melodrama “Die Mommie Die!” on Friday, Sept. 12 at 7 p.m.

The production —a deliciously over-the-top homage to classic Hollywood mid-century thrillers — ­­continues the Playhouse’s artistic partnership with Busch, who reprises his iconic role of the glamorous yet troubled songstress Angela Arden.

Keep ReadingShow less