KENT – Drivers in Kent should use caution Monday, June 8, as routine road maintenance is scheduled to begin on several roads. Highway crews are preparing for annual chip-sealing projects, a process used to repair or extend the lifespan of paved roads.
The following roads are scheduled for treatment:
- Geer Mountain Road (from Ore Hill Road to Jennings Road)
- Ore Hill Road
- South Road
- Kenmont Road
- Bulls Bridge Road (from Route 7 to No. 160)
- Macedonia Brook Road
Town officials said the work is weather dependent and delays or rescheduling are possible. The work is expected to take between three and four days, weather permitting. Temporary speed limit reductions will be in effect because of loose stone on the roadway.
Drivers are urged to follow traffic directions, use caution in work zones and reduce their speed to avoid throwing loose stones into the windshields of passing vehicles.
Residents with questions may contact the Kent Selectman’s Office at 860-927-4628.











